construction engineering references

Construction of the new Tälchenbrücke bridge

Customer: Grün Berlin GmbH
Size of contract: 3,8 million euros
Construction period: 03/2015 – 12/2015

  • Three construction phases: Tälchenbrücke, Wuhletalsteg, platz am See
  • Construction of a new bridge including a viewing gallery
  • Construction of a new bridge including footpath and cycle track
  • Construction of a steel tube platform

Cable duct renovation on the U2 Ruhleben - Olympiastadion underground service

Customer: Berliner Verkehrsbetriebe BVG
Size of contract: 700 thousand euros
Construction period: 03/2015 – 05/2015

  • 155 track-bound driven piles, up to 10 metres long
  • Removal/renewal of 455 metres of concrete trough route
  • 524 metres of railings (steel construction work)
  • 500 metres of track tamping
Cable duct renovation on the U2 Ruhleben - Olympiastadion underground service
Cable duct renovation on the U2 Ruhleben - Olympiastadion underground service
Cable duct renovation on the U2 Ruhleben - Olympiastadion underground service

Embankment remediation on line U5 of the underground railway system

Customer: BVG Berliner Verkehrsbetriebe
Size of contract: 861 thousand euros
Construction period: 06/2014 – 08/2014

  • Special civil engineering
  • Installation of 366 bored piles
  • Track construction
  • tamping
Embankment remediation on line U5 of the underground railway system
 
 

Calau railway overpass

Customer: DB Netz AG
Size of contract: 1.9 million euros
Construction period: 12/2013 – 07/2015

  • Railway overpass replacement including the renewal of three sets of points

Click here to watch the video!

Calau railway overpass
 
 

Berlin Birkenstein

Customer: DB Station & Service AG
Size of contract: 928 thousand euros
Construction period: 07/2013 – 06/2014

  • Building a new pedestrian overpass
  • Construction of two new stairways and two lift shafts
  • Modofication of the station forecourt and suburban rail system platform
  • construction of a new lighting system, Addition to the guidance system, 50 Hz installation
Berlin Birkenstein

Berlin Kaulsdorf

Customer: DB Station & Service AG
Size of contract: 1.0 million euros
Construction period: 06/2013 – 11/2013

  • construction of two new lifts for passengers
  • construction of a new pedestrian bridge
Berlin Kaulsdorf
Berlin Kaulsdorf
Berlin Kaulsdorf

Berlin Albrechtshof

Customer: DB Netz AG
Size of contract: 715 thousand euros
Construction period: 05/2013 – 11/2013

  • construction of two new lifts for passengers and two new pedestrian bridges
  • underground cable works, civil engineering, two rail crossings
  • extension of the existing lighting systems

Berlin Yorckstraße railway bridge

Customer: DB ProjektBau GmbH
Size of contract: 4.3 million euros
Construction period: 04/2013 – 09/2015

  • Building two new steel superstructures Yorckstraße railway bridge and Großgörschenstraße railway bridge
  • a two-stage construction, underground cable works, Suburban rail (S-Bahn) track systems including the associated built structures

Click here to watch the video!

Berlin Yorckstraße railway bridge
 
 

Platform roof Bernau

Customer: DB Station & Service AG
Size of contract: 927 thousand euros
Construction period: 12/2012 – 06/2013

  • Building a new platform roof (excluding foundations)
  • 50 Hz, telecommunications, overhead line systems, control and signalling technology
  • Modification of platform surface